Swamps natural hydrological regime restoration

Product
Plastic pilings type – GW-300 / 5.5 (wall thickness 5.5 mm).

Work completed
In order to restore the natural hydrological regime of higher pure and swamps of Paburgė it was intended to be installed barriers aimed at speeding up the existing artificial canals spontaneous renaturalisation and improve bog hydrological condition. Pilings installed to reduce water table fluctuations in the swamp. Pilings were recessed into 5.1 m peat. Barriers were forged manually. Used pilings are durable, resistant to degradation, friction, biological corrosion, UV rays and frost.

Result
Restoration of swamps‘ hydrological regime, weir of swamp drainage ditches and thus restoring the damaged wetland hydrological regime. Due to this aspect, plastic pilings are particularly suitable solution. Pilings are relatively mild, so wetlands are easy to carry and easy to install.

 